A Decade of Maintenance and Still Going Strong !

Air Options have worked with this Food Production Giant for over a decade. Since our relationship began back in 2003, we have continued to maintain and improve HVAC plant items to minimise downtime, and reduce running costs.

Building Large Industrial Factory
Location Norwich
Manufacturer Daikin process chillers & Mitsubishi Electric air conditioning
Scope PPM site visits, and reactive response
Timescale  2 x PPM visits per annum. 8 hour response.
Project spend Maintenance contract £2,200.00 per annum + VAT
Occupancy Factory & Office Staff
Time & Materials  £40.00 per hour for reactive works
Client Concerns Business continuity and discrete service
Project Success 100%

We attend twice a year to inspect equipment for refrigeration leaks, clean all units and condensers, and inspect, adjust temperature controls. The integrity of all units are checked, testing all drains, pumps, and lubricating all moving parts to prolong longevity. Our engineers carry out all maintenance task including filter cleans, leak testing and a check for system faults.

Once our engineer has completed the regular maintenance, they document the works completed, update F-Gas logs and suggest repairs to be quoted or budgeted. All of this is documented via a bespoke software system integrated within our engineer android smart phones.

Air Options have been key to keeping HVAC plant operational at all times, consequently minimising disruption to the business. We keep the entire process as simple as possible, and manage everything from procurement, to booking maintenance visits and repairs.

All services are backed by our price promise. Call us today !